- 5 -
951-230-008-EN
Version 04
EN
Table of contents
6.5.6 Consolidation of opposite outlets 78
6.5.7 Consolidation of multiple outlets
(crossporting) 78
6.6 Lubrication line connection 80
6.6.1 Mounting process 82
6.9 Lubrication line arrangement 84
6.10 Electrical connection 85
6.10.1 Connecting the inductive 85
6.10.2 Connecting directional solenoid valves 85
7. First start-up 86
7.1 Venting a grease progressive system 86
7.2 Venting an oil progressive system 87
7.3 Inspections before first start-up 88
7.4 Inspections during first start-up 88
8. Operation 89
9. Cleaning 89
9.1 Cleaning agents 89
9.2 Exterior cleaning 90
9.3 Interior cleaning 90
9.4 Cleaning the NAMUR sensor 90
10. Maintenance 91
10.1 General information 91
11. Malfunctions, causes, and remedies 92
11.1 Prior to beginning troubleshooting 92
11.2 Progressive metering device and
system malfunctions 93
12. Repairs 96
12.1 Replacing inductive NAMUR sensor 96
13. Shutdown and disposal 97
13.1 Temporary shutdown 97
13.2 Shutdown and disposal 97
14. Spare parts 98
14.1 Spare parts – VPG 98
14.2 Spare parts – VPK 107
14.3 Spare parts – VPB 114
15. Accessories 117
15.1 VPB bridge designs (crossporting) 117
15.2 VPB check valves 118
15.3 Cable sockets 119