Page 174 December 2007
Telescopic Boom Series
Models SJ61T & SJ66T
194312
Section 5 - ProceduresService and Maintenance
4. Connect the hoses for the platform rotary actuator.
M62252AA
Platform Rotary Actuator Hoses
5. Install the hoses and P-clamps to the side of the jib
boom.
IMPORTANT
Make sure all wiring cables are routed and secured
to avoid pinching or chang as the platform moves.
6. Connect the platform control console, see on
page 175.
CAUTION
Risk of personal injury or equipment damage.
Test equipment operation before putting machine
into service. See Function Tests in the Operating
Manual.
Platform Installation (no Jib Boom)
For torque specications, refer to Table 2.2 Aerial
Platform Torque Specications on page 28.
Procedure:
1. Connect lifting slings to the platform assembly.
2. Using suitable lift equipment, move the platform
into place.
3. Install the main pivot bolt pin, at washer and hex
nut. Tighten to correct torque.
4. Install the bolts that secure the rotary actuator to
the platform base mount. Apply Loctite 242 to the
bolt threads. Tighten to correct torque.
M62066AA
Main Pivot Bolt and Rotary Actuator Bolts
5. Connect the hydraulic hoses to the platform
rotator.
6. Install the P-clamp for the hoses and wire cables to
the side of the y boom nose.
IMPORTANT
Make sure all wiring cables are routed and secured
to avoid pinching or chang as the platform moves.
7. Connect the platform control console, see on
page 175.