EasyManua.ls Logo

SMC Networks HRS Series - Preparation and Wiring of Power Supply Cable

SMC Networks HRS Series
153 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DOC1001322
Chapter 3 Transport and Setting Up
3.3 Installation
HRS Series
3-12
3.3.3 Preparation and wiring of power supply cable
The electrical facilities should be installed and wired in accordance
with local laws and regulations of each country and by a person who
has knowledge and experience.
Check the power supply. Operation with voltages, capacities and
frequencies other than the specified values can cause fire and
electric shock.
Wire with an applicable cable size and terminal. Forcibly mounting
with an unsuitably size cable may result in heat generation or fire.
Prior to wiring lock out and tag out the breaker of the facility power
supply (customer power supply facility).
Connect the power supply cable from the product side first, and then
connect the breaker of the facility power supply (the user’s machine
power supply).
When the panel is removed or mounted, be sure to wear protective shoes
and gloves to prevent injury with the edge of the panel.

Table of Contents

Related product manuals