EasyManua.ls Logo

SPECTRO XEP05 - Page 26

Default Icon
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
— 26 SPECTRO XEPOS — 19.01.2017
4. Log on to the software.
A prompt will request you to initiate the start-up test for the safety circuits
(see Chapter "Proceed with the start-up test"). Follow the instructions on
the screen. During the start-up test, the functionality of the safety circuits
will be tested automatically. If the start-up test is not successful, the high-
voltage supply of the X-ray tube cannot be switched on.
5. After the start-up test, all stepping motors are tested. Follow the instructions
on the screen (see Chapter "Initialization of the stepping motors").
The instrument is switched on. In order to ensure stable measurement
conditions, it is highly recommended to wait 20 minutes before starting the
measurements.

Table of Contents

Related product manuals