EasyManua.ls Logo

SPECTRO XEP05 - Automatic Verification of the Safety Circuits after One Month

Default Icon
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
— 30 SPECTRO XEPOS — 19.01.2017
If the startup test and the initialization were successful, the high-voltage supply of
the X-ray tube can be activated.
The X-ray tube should be switched to standby mode.
On the screen dialog click on "Enter HV-Standby".
After 20 minutes, the spectrometer is stable and ready for measurements.
5.3.4 Automatic verification of the safety circuits after one month
If the device has not been switched off for one month, the software prompts you to
do so. Switch off the device at the key-operated switch and turn it on again after
three seconds, not sooner. Subsequently, connect the device to the software. The
automatic check of the safety circuits starts as described in the chapter 5.3.1.

Table of Contents

Related product manuals