EasyManua.ls Logo

STEP ET Series - Removal and Installation of Operation Panel and Cover Plate; Disassembly and Installation of the Operator

Default Icon
200 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 4 Wiring of Inverter
Shanghai Sigriner STEP Electric Co., Ltd.
- 28 -
Fasteners shall have anti-vibration parts, such as spring washers; the 4 screws of the inverter must be tightened.
3.3 Removal and installation of operation panel and cover plate
3.3.1 Disassembly and installation of the operator
Disassembly and installation of manual operator and wiring cover:
1. Remove the manual operator:
1 Press the jack catch on the manual operator and pull it to dismantle it.
2. Installing the operator
1 When placing the operator back to its original position, press it firmly until you hear a
"click" sound

Table of Contents