WSPC USER INTERFACE Part 2: Administrator Level
60
5. Click “Yes” to confirm commissioning the controller to the selected
compressor model. Commissioning will begin and the progress of the
commissioning process will be shown in the commissioning window. See
Figure 6.5.
Figure 6.5 Commissioning Progress Monitor
As the default settings are loaded to the controller, a commissioning progress
meter will be presented to allow the administrator to monitor the progress of the
commissioning process.
When the default settings have finished loading to the controller, a final
confirmation box will appear indicating that commissioning is complete (Figure
6.6). Turn the controller power off, then click “OK” to confirm. To verify, restore
power and reconnect to controller. Verify machine information (refer to Section
3.3).
Once a controller has been commissioned, it can be used to control and monitor
the operation of the compressor and log new compressor operation data.
Parameters set during commissioning can be later adjusted by the end user to
customize the compressor for a specific application.
Figure 6.6 Commissioning the controller
6.4 MAINTENANCE DISPLAY
The Maintenance Display at the Administrator level displays the same warning
and maintenance information as at the User level (Refer to Section 3.5). The
Administrator level Maintenance display includes additional functions that allow
the administrator to view the maintenance information in greater detail and to
reset the service and warning messages. See Figure 6.7. The additional
functions of the administrator level Maintenance display are described below.