EasyManua.ls Logo

Suzuki RM-Z250 - Page 167

Suzuki RM-Z250
219 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DISASSEMBLY AND ASSEMBLY 4-87
Loosen and remove the fork cap bolt 9 (sub-tank) from the
outer tube with the special tool and slowly slide down the
outer tube.
09941-53630: Front fork cap socket wrench (50 mm)
Pour the specified amount of fork oil into the outer tube.
Oil quantity (When standard fork spring is used):
388 ml (13.11/13.66 US/lmp oz)
FORK OIL SS-19 or equivalent
Raise the outer tube and temporarily tighten the fork cap bolt
9 (sub-tank) with the special tool.
09941-53630: Front fork cap socket wrench (50 mm)
INSTALLATION
Install the front fork with the upper surface T of the outer tube
positioned 1.0 mm (0.04 in) B from the upper surface of the
upper bracket.
Check that the air valve A is positioned at the front.
Tighten the fork lower clamp bolts 1 to the specified torque.
Fork lower clamp bolt: 23 N·m (2.3 kgf-m, 16.5 lbf-ft)

Table of Contents

Other manuals for Suzuki RM-Z250

Related product manuals