Content page
4.2 Transportation..……………………………………………………….…
4-2
4.2.1 The diagram of the machine weight and its gravity center...……………
4-2
4.2.2 The movement of the machine……. ……………………………………
4-2
4.2.3 The order to pack..………………………………………………………
4-3
4.3 Installation of the machine..……………………………………………..
4-4
4.3.1 Have the machine set onto the fastening bolts of the crate base...………
4-4
4.3.2 Level adjusting…………………………………………………………..
4-5
4.3.3 The installation of the electricity...……………………………………...
4-5
4.4 The test after installation………………………………………………...
4-6
4.5 The procedure for dismantling the machine…..………………………...
4-6
CHAPTER 5 Operation……………………………………………………………..
5-1
5.1 A brief introduction to the relevant operation hardware………………...
5-1
5.1.1 ( For TPR-720A, TPR-820A, TPR-920A)………………………………
5-1
5.1.2 ( For TPR-1100)…………………………………………………………
5-4
5.1.3 Safty protective device…………………………………………………..
5-7
5.2 Instruction to switches..…………………………………………………
5-8
I ( For TPR-720A, TPR-820A, TPR-920A)………………………………
( For TPR-1100)….……………………………………………………...
5-11
5.3
Installation of the clamp(work piece….……………………………….
5-12
5.3.1 General...………………………………………………………………...
5-12
5.3.2 Introduction of the vise and the clamping of the work piece...………….
5-12
5.3.3 Universal clamp and the clamping of the work piece…………………...
5-13
5.4 Installation and change of the drilling bit……………………………….
5-15
5.4.1 The assembly and disassembly of the drilling head and clamp...……….
5-16
5.4.2 The assembly and disassembly of the straight handle drill bit….………
5-18
5.5 Power on and off..……………………………………………………….
5-19
5.5.1 Power on..……………………………………………………………….
5-19
5.5.2 Power off..……………………………………………………………….
5-19
5.6 Work light..……………………………………………………………...
5-19
5.7 Cutting fluids...………………………………………………………….
5-19
5.8 Elevating the arm..………………………………………………………
5-20
5.9 Rotate the arm right or leftwards.……………………………………….
5-21
5.10 Rotate the arm to or backwards...……………………………………….
5-22
5.11 Change the spindle speed.……………………………………………….
For TPR-720A, TPR-820A, TPR-920A...……………………………….
Speedometer...…………………………………………………………...
Change spindle speed...………………………………………………….
For TPR-1100….………………………………………………………...
The speedometer at the time when the pole switch is in high position….
Change spindle speed…………………………………………………...
The speedometer at the time when the pole switch is in low position…..