EasyManua.ls Logo

Tait TB7100 - Applying Power

Tait TB7100
142 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TB7100 Installation and Operation Manual Preparation for Operation 81
© Tait Electronics Limited December 2005
7.3.4 Applying Power
Before turning on the base station, check that:
all looms and cables at the front and rear of the base station are fitted
correctly
all connectors are secure
the 20A fuse is fitted.
Turn on the power supply and check that the base station powers up
correctly:
The power LED on the user interface lights up.
The LCD indicates the current channel number.
Figure 7.2 System interface link positions
J400J500 J502J503
J207
W401
W402
J206
J507
J501

Table of Contents

Other manuals for Tait TB7100

Related product manuals