THRUSH AIRCRAFT, INC – MODEL S2R-G10
AIRCRAFT MAINTENANCE MANUAL
Effective: 03/26/2010 Page 9-5
* NOTE *
Excessive uncured adhesive can
be cleaned up with ketone type
solvents. (When using solvents,
extinguish all ignition sources
and follow the manufacturer’s
directions and precautions for
use and handling such
materials.) Application of
adhesive to substrates should be
made within seventy-five
minutes after mixing. Working
life is eighty minutes. Higher
temperatures will reduce these
times.
Allow 24 hours for sealer to cure before
putting airplane back into service. Reinstall
tubes, controls and cables and pump. Fill
hopper and check for leaks. Water should
be allowed to stay in hopper for a minimum
of two hours with no leaks.
SPRAY DISPERSAL SYSTEM
Ref. Figure 9-4
The standard spray dispersal system of the
S2R-G10 consists of the hopper, the
pressure loading valve and tube, the
gatebox, the spray pump, recirculation valve,
delivery plumbing, and the nozzle equipped
spray boom.
Figure 9-3: Liquid Di
spersal Equipment
DISPERSAL SYSTEM MAINTENANCE
In conjunction with the manufacturer's
instructions for maintenance of the spray
pump, it is recommended that at the 100
hour inspections the following be
accomplished:
A. Inspect the hopper baffles for security
and condition.
B. Inspect hopper lid for condition of seal
and security of latches.