2.9 TD80 Installation Checklist
2. Install the 1” NPT Top Fitting
3. Install the Anchor Cone
6. Mount the Finch Display
7. Mount the Relay Module (optional)
8. Mount the Alarm Accessories (optional)
9. Inspect the Mechanical Installation
10. Install the Electrical Wiring
11. Set and Verify the Finch Display Jumpers
12. Confirm Fuses Installed with Correct Type and Rating
13. Perform the TD80 Basic Operation Test
14. Verify TD80 Transmitter Programming
15. Set the Fill or Fall Alarm Level
16. Perform the TD80 System Test and Verification
17. Perform the Offset Calibration