Document Ref 942583-001 Rev 8 3
Quantium 510 Installation Manual Revision Record
Date Revision Chapter Reason
7 3-14, 3-15 Ground Frame part numbers table added
7 3-20 Updated 4F2C VHS 4-4 drawing
7 5-1 Section 5 Contents updated
7 5-24 New section added, Installation of TQP-HS Pumps
7 5-26 New section added, Fitting a Risbridger Check Valve
7 5-27, 5-28 Section 5.6.1 Junction Box Wiring updated
7 Back Cover Glossary updated and address change
29/08/2014 7.1 2-21 New Submerged Connection after May 2014 drawing added
2-24 New Submerged with Nefit Adapt/Shear Valve May 2014
2-24 Note added regarding model HSM 5-8 dim
3-23 Note added regarding model SVHSM 5-5 dim
5-26 Sect 5.5.4 text removed
6-8 Sect 6.3 text and photo updated for new submerged
5-22 5.4.8 Leak plate sealing added
5-28 to 5-29 5.5.6 New Submerged Installation - Manufactured after January
2015 added
13.04.2015 8.0 Section 5.5.5
Revised procedure to warn against strain or twisting VR flexi
pipe (ECR2782). Removed unnecessary photo.