eachsideofthemachinewithabolt(1/2x1-1/2
inches)andalocknut(1/2inch)asshownin
Figure36.
9.Torquetheboltandlocknutto91to113N∙m(67
to83ft-lb).
10.Repeatsteps7through9attheothersideofthe
tankskidandmachine.
14
InstallingtheCenterBoom
Section
Partsneededforthisprocedure:
1
Center-boomassembly
10
Bolt(3/8x1inch)
10
Flangelocknut(3/8inch)
2Boom-transportcradle
4
Bolt(1/2x1-1/4inches)
4
Flangenut(1/2inch)
AssemblingtheBoom-Transport
Cradles
1.Attachliftingequipmenttothecenterboom
sectionandremoveitfromtheshipping
container.
2.Aligntheboomtransportcradlestothecenter
boomsection(Figure37).
g028458
Figure37
1.Boom-transportcradle
4.Horizontalhole(boom
centersection)
2.Bolts(3/8x1inch)5.Flangedlocknut(3/8inch)
3.Verticalholes(boom
centersection)
3.Assemblethecradlestotheboomsection
(Figure37andFigure38)with6bolts(3/8x1
inch)and6angedlocknuts(3/8inch).
g028459
Figure38
1.Locknuts(3/8inch)
4.Torquetheboltsandnutsto37to45N∙m(27
to33ft-lb).
InstallingtheCenterBoomSection
totheTankSkid
1.Startthemachine,removethebedsupportfrom
theliftcylinderandstowthesupport,lowerthe
tankskid,shutoffthemachine,andremovethe
keyfromthestarterswitch.
2.Alignthebottomholeinthesectionmounting
bracketsofthecenterboomassemblywiththe