thirdholefromthebottomintheboomsupports
onthesprayskidframe,asshowninFigure39.
Note:Ifnecessary,loosentheboomsupports
andadjustedthemtothecenterboomsection
forbetterholealignment.T orquetheboltsand
nutsto67to83N∙m(91to113ft-lb).
g028460
Figure39
1.Locknut(1/2inch)4.Sectionmountingbracket
(right)
2.Hole3—fromthebottom
(boomsupport)
5.Bolt(1/2x1-1/4inches)
3.Sectionmountingbracket
(left)
3.Assemblethecenterboomassemblytothe
sprayskidframewith4bolts(1/2x1-1/4inches)
and4locknuts(1/2inch).
4.Torquetheboltsandnutsto67to83N∙m(91
to113ft-lb).
ConnectingtheHosesandWiring
fortheBoomLiftValve
•ForHD-SeriesModelswithaManualTransmission,
refertotheinstallationinstructionsfortheMultiPro
WMTurfSprayerFinishingKit,ManualWorkman
UtilityVehicle.
•ForHDX-AutoModel,refertotheinstallation
instructionsfortheMultiProWMTurfSprayer
FinishingKit,AutomaticWorkmanUtilityVehicle.
15
InstallingtheLeftandRight
BoomSection
Partsneededforthisprocedure:
1
Leftboomsection
1Rightboomsection
8
Flange-headbolts(3/8x1-1/4inch)
8Backingplates
8
Flangelocknuts(3/8inch)
2
Clevispin
2Hairpin
Procedure
Eachboomsectionweighsapproximately14kg(30
lb).
1.Removethe4ange-headbolts(3/8x1-1/4
inch),4backingplates,and4angelocknuts
(3/8inch)fromthehingebracketofthe
center-boomsection.
2.Rotateeachpivotbracketattheendofthe
centerboomsectionsothatthebracketsalign
vertically(Figure40).
g028737
Figure40
1.Centerboomsection
5.Triangularmountingplate
2.Boomextension6.Backingplates
3.Hingeplate
7.Flangelocknuts(3/8inch)
4.Flange-headbolts(3/8x
1-1/4inch)
3.Lifttheouterboomsectionandalignholesinthe
triangularmountingplateattheendoftheouter
boomsectionwiththeholesinthepivotbracket.
32