TestProcedure
1.Oncethetestequipmentisproperlyconnected,youcanruntheengineand
pumptowarmthehydraulicuidtooperatingtemperature.
Anytestprocedurethatrequiresanopenoruncappedline(likeacasedrain
leakcheck)wouldnotapply.Inthoseraresituations,thehydraulicuid
shouldbewarmedbeforedisconnectingthelines.
CAUTION
Beforeopeningthehydraulicsystem,operateallthehydraulic
controlstoreleasesystempressureandavoidinjuryfromthe
pressurizedhydraulicuid;refertoReleasingPressurefromthe
HydraulicSystem(page5–5).
2.Parkthemachineonalevelsurface,lowerthecuttingdeck,shutoffthe
engine,andsettheparkingbrake.
3.ReadallWarning,Cautions,andprecautionslistedatthebeginningofthis
section.
4.Accessthehydraulicpumpfromrightsideasbelow:
g215339
Figure52
1.Handle2.Latch
A.Pushthelatch(item2)inwardtowardtheradiator(Figure52).
B.Usingthehandle(item1),rotatetheradiatortoaccessthehydraulic
pump(Figure52).
ProLineH800
Page5–45
HydraulicSystem:TestingtheHydraulicSystem
19241SLRevB