EasyManua.ls Logo

Toshiba TS3000 Series - 6.12 Finishing Test Operation

Toshiba TS3000 Series
368 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATOR’S MANUAL
series Robot Controller
6.12 Finishing Test Operation
To finish test operation, execute the "execution file reset" function described in Para
6.8. However, as you can guide the robot even when the execution file has already
been selected, you do not particularly need to reset the file.
You can also finish test operation in operation mode other than "TEACHING" by
means of the MODE select switch on the control panel.
STE 80720
– 6-40

Table of Contents

Related product manuals