Calibration
28 RMWH-SVX001C-EN
10. On the Span Gas Calibration screen, select Start.
A progress bar shows during the span gas calibration.
11. When span gas calibration is complete, the Results
screen shows. Select Continue.
12. On the Calibration Complete screen, do one of the
following:
a. To do a span gas calibration for another gas, select
Select Another Gas. Repeat Ste
p 3 through Step
11.
b. To return to the Results screen,
select Back.
c. To go
to the next step, select Continue.
13. Close the span gas cylinder valve.
14. On the Set Reminder screen, select the applicable
button for the calibration interval. At the selected
interval, a pop-up will signal the need for calibration.
15. Select Next.
16. On the bottom of the device, install the pin in the
calibration port.
17. Remove the tubing from the cali
bration port.
18. On the device touchscreen, select Done.