Transport and installation
Transport and unpacking
30 07/2019 244156V03_EN
4.2 Transport and unpacking
4.2.1 Unloading the machine
1. Observe the safety instructions.
2. Take the weight of the packages from the shipping paperwork.
3. Use means of transport with sufficient load-bearing strength to trans-
port the packages.
4. Transport the machine in a horizontal position.
4.2.2 Unpacking the machine
The machine is transported from the factory in secure packaging.
1. Remove the packaging and examine the machine for any possible
transport damage.
Submit a written complaint to the carrier immediately in the event of
transport damage!
2. Compare the delivery with the delivery note!
4.2.3 Installation
1. Both the front castors are equipped with a parking brake so that the ma-
chine is stable during operation.
2. Press down the locking lever (1) to lock the brake.
3. You must release the brake to move the machine.
4. Press down the unlocking lever (2) to release the brake.
1
2
AR1006 / 0