F3200 Operator's Manual Document No: LT0119
Operating Instructions - Zone Functions
Page 7-2 29 July 2002 Issue 2.04
7.1 ZONE ALARM OR FAULT TEST
7.1.1 FUNCTION
To test the circuit input of a selected alarm zone or group of zones and to send test
alarm signals to the Brigade. Two tests can be performed:
(a) A fault simulation test, or
(b) An alarm simulation test.
WARNING: This test performs a true zone test, time delays operate, and, unless the
zone is isolated, all outputs operate, including Bells and the Brigade
Alarm.
For network systems: to test a local zone follow this section; to test a remote zone refer
to Section 11.10.6.
7.1.2 OPERATING SEQUENCE
OPTION: To prevent mapped outputs from operating, ISOLATE the zone(s) first.
- Refer to "Zone Isolate or De-Isolating" section 7.2.
From the base display, press:
OR
where n n is the number of the zone to test.
Alternatively, from the zone status recall display for the zone to be tested, press:
OR FOLLOWED BY