PRE-START CHECKLIST
After all requirements in this checklist have
been met, the machine is ready for operation.
1. Safety: All operators must have a thor-
ough understanding of the safe operation of
this machine (Figure 25).
2. Location: Machine must have ample
space on all sides so that operators can
move safely and easily in a clean, dry work
area.
3. Electrical power: Machine must be
properly wired and the starter enclosure
door screws securely fastened.
4. Safety switches: Switches must be in
working order with guards securely in
place.
OPERATION
Start-up and Stopping
30
Figure 25 — Read and obey all warnings in this manu-
al and on the machine.
w
WARNING:
KEEP HANDS AWAY
FROM FEED OPENING
w
WARNING:
KEEP HANDS AWAY
FROM DISCHARGE OPENING