BA 357-00 * 3.0 * 35700_05_Bedienung.fm 5-85
Operation 5
Backfilling round gravel and precise unloading
• Precise dosing and placement of pourable material.
Advantage of working method:
• Teeth move back from the wall as the bucket opens.
Unloading from the bottom of the bucket for
increased tilt-out heights
Advantage of working method:
• The dumping height can be increased by at least 55 cm (21.6 in)
(depending on bucket size), as compared to tilting
out with a standard bucket.
• Material can be pushed with the open multipurpose bucket.