EasyManuals Logo

Wacker Neuson LTN 6L User Manual

Wacker Neuson LTN 6L
118 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #34 background imageLoading...
Page #34 background image
Operation LTN 6L
34 wc_tx000766gb.fm
4.4 Preparing Trailer for Towing or Lifting
See Graphic: wc_gr005073, wc_gr005074
4.4.1 Check that the tower cradle lock pin (j) is in place and secured with the
safety pin.
4.4.2 Ensure that the tower is completely nested inside the transport cradle
and the pin (t) is secure.
4.4.3 Make sure the doors are properly latched.
4.4.4 Return the outriggers to their travel position. Check that the outrigger
bars and jacks are locked in place.
4.4.5 Crank the rear jack (f) all the way in and rotate it 90°.
The Light Tower is now ready to lift. Use the designated lift points.
For towing, continue.
4.4.6 Use the tongue jack (a) to raise the trailer tongue up and then lower it
over hitch on towing vehicle. Lock the hitch to coupling and attach the
safety chains. Swivel the tongue jack 90° and lock it in place.
4.4.7 Connect the trailer wiring to the towing vehicle. Check the brake, turn,
and tail lights for proper operation.
4.4.8 Position the light fixtures (k) down. For rough, off-road transportation
remove lamps from fixtures to avoid damage.
4.4.9 Check the tire inflation.
NOTICE: Maximum recommended speed for highway towing is 72
km/hour (45 MPH). Recommended off-road towing speed is not to
exceed 16 km/hour (10 MPH) or less depending on terrain.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson LTN 6L and is the answer not in the manual?

Wacker Neuson LTN 6L Specifications

General IconGeneral
BrandWacker Neuson
ModelLTN 6L
CategoryLighting Equipment
LanguageEnglish

Related product manuals