Operation LTN 6L
48 wc_tx000766gb.fm
4.16 Operating Lights
See Graphic: wc_gr005140, wc_gr006328, wc_gr005141, wc_gr005142
Turn on the main circuit breaker (a) first, then turn on each light circuit
breaker (b), one at a time.
Metal halide floodlights require a warm-up time of 5–15 minutes before
they reach full output. If the floodlights are shut down, a 10-minute
cool-down period is required before turning them back on.
4.17 Stopping
See Graphic: wc_gr005140, wc_gr006328, wc_gr005141, wc_gr005142
4.17.1 Turn the circuit breakers (a, b, c) off and remove any other loads from
the generator.
NOTICE: Never shut down the engine without turning off the lights.
Damage to the generator will occur.
4.17.2 Turn the key (q) to the off position.
4.18 Derating
All generator sets are subject to derating for altitude and temperature.
Although derating should not affect operation of the floodlights, it will
reduce the available reserve power to the receptacle.
Ratings are typically reduced 3% per 300 m (1000 feet) elevation from
sea level, and 2% per 10°F (5.5°C) increase in ambient temperature
above 78°F (25°C).

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson LTN 6L and is the answer not in the manual?

Wacker Neuson LTN 6L Specifications

General IconGeneral
BrandWacker Neuson
ModelLTN 6L
CategoryLighting Equipment
LanguageEnglish

Related product manuals