Drive the roller slowly and carefully from the loading area.
For crane loading, always attach appropriate sling equipment at the
lifting lugs provided for them. The crane vehicle must be positioned
on flat ground providing the bearing capacity required while observing
all relevant safety regulations. In addition, take suitable precautions
to block access to the lifting area in order to prevent any person from
moving or staying within the danger zone. The crane's load table
must correspond to the machine to be lifted. No crane loading must
be performed unless all these items have been complied with.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson RD24 and is the answer not in the manual?

Wacker Neuson RD24 Specifications

General IconGeneral
BrandWacker Neuson
ModelRD24
CategoryConstruction Equipment
LanguageEnglish

Related product manuals