EasyManua.ls Logo

WAGNER PEM-X1 - Double Click Program

WAGNER PEM-X1
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating manual Manual powder spray gun PEM-X1
8 Cleaning and Maintenance
32 Order number 2326020 | Edition 10/2022
After maintenance
Carry out safety checks in accordance with Chapter Safety Checks [832].
Put the system into operation and check for leaks.
Have the system checked for safe condition by a skilled person.
8.2.3 Safety Checks
8.2.3.1 Grounding Check
Every day
4 Before starting work, carry out a visual check to ensure that the system is grounded.
8.2.4 Maintenance Procedures
The maintenance intervals should be adapted by the operator depending on the level of use
and if necessary the level of soiling.
If in doubt, we recommend contacting WAGNER's specialist personnel.
Maintenance work Time stamp
Per shift Weekly
Blow out gun and check for sintering x
Check gun settings x
Blow out powder hoses x
Check grounding x
Check compressed air quality x
Check gun voltage x
Check powder hoses for bends and sintering x
8.3 EXCHANGING THE MANUAL GUN
Before replacing the spray gun, any powder residue must be thoroughly removed.
The wearing parts in the spray gun, marked in the spare parts list with , must be regularly
checked and replaced if necessary.

Table of Contents

Other manuals for WAGNER PEM-X1

Related product manuals