EasyManua.ls Logo

Wieland SP-SDIO - Checklist for Manufacturers

Default Icon
110 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Appendix
Wieland Electric GmbH | BA000966 | 07/2016 (Rev. C)
95
Checklist for manufacturers
888586251
The information in the following points must be available at least during first-time commission-
ing. It may vary depending on the application and the requirements from the manufactu-
rer/supplier must be checked.
This checklist should be retained or stored with the machine documents so that it can be used
as a reference during recurring tests.
NOTICE
This checklist is not a replacement for the first-time commissioning or the regular testing
done by a qualified person.
Table 52: Checklist for first-time commissioning
Question
Yes
No
Were the safety guidelines according to the directives/standards valid
for the machine used as a basis?
Yes
o
No
o
Are the directives and standards used listed in the Declaration of Con-
formity?
Yes
o
No
o
Does the safety equipment correspond to the required category?
Yes
o
No
o
Are the required protective measures against electric shock effective
(protection class)?
Yes
o
No
o
Has the protective function been checked in accordance with the
testing information in this documentation? In particular:
Functional check of the command devices, sensors, and actuators
connected to the safety control
Test of all switch-off paths
Yes
o
No
o
Have you ensured that a complete test of the safety functions has
been carried out after every configuration change to the safety con-
trol?
Yes
o
No
o
14.2

Table of Contents

Related product manuals