EasyManua.ls Logo

Woodway PATH - Assembly Instructions; Preparation; 4 Front

Woodway PATH
136 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
44 03/2016 UM-MT-EN-01
6.4 Assembly Instructions
6.4.1 Preparation
The treadmill can be delivered in various states of assembly. Disassembly/assembly may
be required for moves or relocation into other rooms.
NOTE
In WOODWAY performance and fitness treadmills, standard (inch) screws and
nuts are used, with few exceptions.
These are not compatible with metric fastening elements!
Due to the heavy weight of the device, it is recommended to install the treadmill as close
to its final location as possible.
Carefully dismantle the shipping crate. To do this, remove the screwed connections. Re-
move protective foil from all packaged parts. Ensure that the surfaces are not damaged
by sharp objects (knife, etc.).
NOTE
It is recommended to have a second person assist in inserting the railing
tubes or with the assembly.
6.4.2 4Front
Tools required for assembly:
1x combination wrench or ratchet wrench, ½”
1x Phillips head screwdriver, #2
1. Remove the covers on the
left and right.
Fig. 15 4Front assembly, side panel
Preparation Steps

Table of Contents

Other manuals for Woodway PATH

Related product manuals