EasyManua.ls Logo

YASKAWA SGD7S-****20A Series - Page 263

YASKAWA SGD7S-****20A Series
561 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7.4 Trial Operation with MECHATROLINK-III Communications
7-11
11.
While operation is in progress for step 10, confirm the following items.
Note: If the load machine is not sufficiently broken in before trial operation, the Servomotor may become over-
loaded.
Confirmation Item Reference
Confirm that the rotational direction of the
Servomotor agrees with the forward or
reverse reference. If they do not agree, cor-
rect the rotation direction of the Servomo-
tor.
5.5 Motor Direction Setting on page 5-16
Confirm that no abnormal vibration, noise,
or temperature rise occurs. If any abnor-
malities are found, implement corrections.
12.5 Troubleshooting Based on the Operation and Condi-
tions of the Servomotor on page 12-59

Table of Contents

Related product manuals