EasyManuals Logo

YOKOGAWA STARDOM FCN-RTU User Manual

YOKOGAWA STARDOM FCN-RTU
226 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #80 background imageLoading...
Page #80 background image
<5. Function Test>
TI 34P02K35-02E
Jun. 6, 2018-00
Suffix code on CPU module
Consider whether the suffix code on CPU module of the in-house test equipment
differ from the suffix code for target equipment.
Compare the suffix code on CPU module of the in-house test equipment against the
suffix code for target equipment, and check for any debugging problem.
Debugging Problem Example 1
To create a using NPAS POU application, an FCN-500 extended type (with
NPAS license) was purchased for the target equipment, but the NPAS POU
license was not included in the FCN-500 standard type for the in-house test
equipment.
Debugging Problem Example 2
As there is no need to use NPAS_POU, NFCP501 standard type (without NPAS
license) was purchased for the target equipment. However, the in-house
development equipment has FCN-500 extended type (with NPAS_POU license),
and an engineer created an application using NPAS_POU without realizing that
FCN-500 standard type (without NPAS_POU license) was purchased for the
target equipment.
In this example, the FCN-500 of the in-house equipment ran normally during
function test as an NPAS_POU license was present.
However, when the application was moved to the target equipment, the FCN-500
no longer runs and it was necessary to either fix the application or purchase an
FCN-500 extended type for the target equipment.
Installed I/O Modules
As described in Section 5.5.1, “Checking CPU Load,” CPU load includes I/O module
access.
If the I/O modules installed on in-house test equipment differ from those to be
installed on the target equipment, an accurate CPU load cannot be reflected so CPU
load checking cannot be done on the in-house test equipment.
Duplexed Parts
In a STARDOM system, the CPU of the FCN-500, the power supply module, the E2
bus/SB bus, the control network (Ethernet) and the communication application can
be duplexed.
However, parts required to be duplexed in the system may not be duplexed in the in-
house test equipment.
In such cases, investigate whether there is any problem with performing function
tests without duplexing, and how to perform switchover test for the duplexed parts.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the YOKOGAWA STARDOM FCN-RTU and is the answer not in the manual?

YOKOGAWA STARDOM FCN-RTU Specifications

General IconGeneral
BrandYOKOGAWA
ModelSTARDOM FCN-RTU
CategoryController
LanguageEnglish

Related product manuals