EasyManua.ls Logo

ZOLL EMV+ - Page 149

ZOLL EMV+
228 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Service Kit Installation Procedures
4–94 www.zoll.com 906-0731-04-01 Rev. C
14 Check to ensure that the surfaces between SPM
Mix Manifold, SPM Oxygen Inlet Manifold, and
Compressor-SPM Connector are flushed before
re-install the whole Manifold Assembly to the
Top Panel Connector and Compressor Pump.
NOTE Once re-assembly is completed you must calibrate and test the ventilator with the RCS.
Step Action

Table of Contents