EasyManua.ls Logo

ZOLL EMV+ - Page 97

ZOLL EMV+
228 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Service Kit Installation Procedures
4–42 www.zoll.com 906-0731-04-01 Rev. C
Instructions
Step Action
1 Loosen by 1 full turn and do not remove the four
8-32 x 3 screws on the outer air intake. (Additional
loosening may cause the filter disk to slip out of
place)
2 Loosen and remove the two 10-32 Keps nuts and
the four 6-32 x 2 screws.
Save these screws and Keps nuts.
Remove the back case by lifting from the
ventilator.
3 Remove the two 4-40 x 1/4 screws on the dovetail
mounting bracket.
Save these screws.
Disconnect the ribbon cable on the PIM board by
simultaneously applying pressure on the two
ejector latches.
4 Flip the ventilator over and remove the front case
assembly by lifting it straight up away from the
ventilator module.
5 Remove the battery compartment cover by
unscrewing the four 6-32 x 5/16 screws.
Save these screws.
6 Remove the battery by unscrewing the four 6-32 x
2 1/4 screws and detaching the plug from its
locking latch.
Save these screws.

Table of Contents

Other manuals for ZOLL EMV+

Related product manuals