EasyManua.ls Logo

ABB IRB 120 - Page 168

ABB IRB 120
272 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
InformationAction
Tightening torque: 1 Nm.
xx0900000848
Refit the lower arm covers.12
Clean Room robots: seal and paint the joints
that have been opened. See Replacing parts
on the robot on page 118
Note
After all repair work, wipe the robot free
from particles with spirit on a lint free cloth.
13
See chapter:
Calibration on page 225.
Recalibrate the robot.14
DANGER
Make sure all safety requirements are met
when performing the first test run. These
are further detailed in the section DANGER
- First test run may cause injury or damage!
on page 47.
15
168 Product manual - IRB 120
3HAC035728-001 Revision: N
© Copyright 2009-2017 ABB. All rights reserved.
4 Repair
4.6.1 Replacing the lower arm
Continued

Table of Contents

Other manuals for ABB IRB 120

Related product manuals