NoteAction
Flange sealant, Loctite 574: 12340011-
116.
xx1700000415
Apply flange sealant in two strings according
to the figure.
6
Apply some grease on:
• the outside of the bearing
• the guiding part of the bearing
• the edge of the protection tube
• the edge around the gearbox.
7
Guide pin, M16x120: 3HAC062397-001 (2
pcs).
Apply guide pins in the guide pin holes in the
gearbox.
Tip
Lubricate the guide pins with some grease
to make the frame slide better.
8
Always use guide pins in pairs.
xx1700000329
Refitting the arm system
NoteAction
CAUTION
The arm system weighs 1300 Kg.
All lifting accessories used must be sized
accordingly!
1
See Attachment points of lifting accessory
on page 212.
Make sure that all lifting accessories still is
fitted correctly on the arm system.
2
Continues on next page
652 Product manual - IRB 6700
3HAC044266-001 Revision: N
© Copyright 2013 - 2018 ABB. All rights reserved.
4 Repair
4.8.2 Replacing the axis-1 gearbox (IRB 6700 - 300/2.70, IRB 6700 - 245/3.00)
Continued