EasyManua.ls Logo

ABB IRB 6700 Series - Page 652

ABB IRB 6700 Series
846 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
Flange sealant, Loctite 574: 12340011-
116.
xx1700000415
Apply flange sealant in two strings according
to the figure.
6
Apply some grease on:
the outside of the bearing
the guiding part of the bearing
the edge of the protection tube
the edge around the gearbox.
7
Guide pin, M16x120: 3HAC062397-001 (2
pcs).
Apply guide pins in the guide pin holes in the
gearbox.
Tip
Lubricate the guide pins with some grease
to make the frame slide better.
8
Always use guide pins in pairs.
xx1700000329
Refitting the arm system
NoteAction
CAUTION
The arm system weighs 1300 Kg.
All lifting accessories used must be sized
accordingly!
1
See Attachment points of lifting accessory
on page 212.
Make sure that all lifting accessories still is
fitted correctly on the arm system.
2
Continues on next page
652 Product manual - IRB 6700
3HAC044266-001 Revision: N
© Copyright 2013 - 2018 ABB. All rights reserved.
4 Repair
4.8.2 Replacing the axis-1 gearbox (IRB 6700 - 300/2.70, IRB 6700 - 245/3.00)
Continued

Table of Contents

Related product manuals