EasyManua.ls Logo

ABB IRB 6700 Series - Page 692

ABB IRB 6700 Series
846 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
Slide the lower arm on to the guide pins.9
Use caution and move the arms into posi-
tion at the axis-2 gearbox on the guide pins.
10
Screws: M16x50 quality steel 12.9 Gleitmo
xx1300000789
Fit all now accessible attachment screws
and washers.
11
Screws: M16x50 quality steel 12.9 GleitmoRemove the two guide pins and replace
with the remaining attachment screws and
washers.
12
Tightening torque M16: 300 NmSecure the lower arm to the axis-2 gearbox
with its attachment screws.
13
Disconnect the 24 VDC power supply.14
Remove the lifting accessories.15
Connecting the axis-2 motor cables
NoteAction
xx1300000738
Push the motor cables through the cable
gland opening.
1
Continues on next page
692 Product manual - IRB 6700
3HAC044266-001 Revision: N
© Copyright 2013 - 2018 ABB. All rights reserved.
4 Repair
4.8.3 Replacing the axis-2 gearbox (IRB 6700 - 235/2.65, IRB 6700 - 205/2.80, IRB 6700 - 175/3.05, IRB
6700 - 150/3.20, IRB 6700 - 200/2.60, IRB 6700 - 155/2.85)
Continued

Table of Contents

Related product manuals