EasyManua.ls Logo

ABB IRB 6710 - Page 549

ABB IRB 6710
640 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Refitting the cable harness to the upper arm
NoteAction
Torx pan head screw: M6x16 A4-80Refit the metal clamp beneath the arm
house.
1
Tightening torque: 10 Nm.
xx2200002142
xx1300000668
Tip
Use tape and tie the axis-5 and axis-6
connectors and carrier into a bundle (if not
already done). This is done to facilitate the
procedure and to avoid damaging the parts
during the procedure.
This will also make it easier to run the cable
harness through the inside of the robot.
2
Continues on next page
Product manual - IRB 6710 549
3HAC085695-001 Revision: A
© Copyright 2023 ABB. All rights reserved.
5 Repair
5.8.3 Replacing the axis-3 gearbox
Continued

Table of Contents

Related product manuals