EasyManua.ls Logo

ABB IRB 6710 - Page 551

ABB IRB 6710
640 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
Person 1, working at the side hole:Use caution and push the cable harness
into the wrist.
Tip
This step is best performed by two persons
working together:
Person 1: Put one hand inside the
side cover hole and take a hold of
the cable harness.
Person 2: Take a hold of the cable
harness from inside the wrist.
Together: Move the cable harness
past the axis-5 motor and into the
wrist.
4
xx2300000035
Person 2, working at the wrist:
xx2300000041
Torx pan head screw: M6x16 A4-80Refit the metal clamp axis-4, inside the arm
tube.
Note
The screw is reached from outside the up-
per arm.
5
Tightening torque: 10 Nm.
xx2300000033
xx2300000032
Continues on next page
Product manual - IRB 6710 551
3HAC085695-001 Revision: A
© Copyright 2023 ABB. All rights reserved.
5 Repair
5.8.3 Replacing the axis-3 gearbox
Continued

Table of Contents

Related product manuals