EasyManua.ls Logo

ABB IRB 6710 - Page 556

ABB IRB 6710
640 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
Torx pan head screw: M5x12 Stainless
steel A2-70
Refit the motor cover with its attachment
screws.
7
Locking liquid: Loctite 2400 (or equivalent
Loctite 243)
Use locking liquid.
Tightening torque: 6 Nm.
NoteAction
xx2300000014
Verify that the cables are connected and routed
correctly to each motor according to the figure
and according to the markings on the connectors.
1
Connecting the axis-5 motor cables
NoteAction
Put the motor cables in place in the open-
ing.
1
Torx pan head screw: M3x12 Stainless
steel A2-70
Refit the cable bracket with the screws.2
xx2200001735
Continues on next page
556 Product manual - IRB 6710
3HAC085695-001 Revision: A
© Copyright 2023 ABB. All rights reserved.
5 Repair
5.8.3 Replacing the axis-3 gearbox
Continued

Table of Contents

Related product manuals