EasyManua.ls Logo

ABB IRB 6710 - Page 593

ABB IRB 6710
640 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Action
Tap Update.
A dialog box is displayed, warning that the updating operation cannot be undone:
Tap Update to proceed with updating the revolution counters.
Tap Cancel to cancel updating the revolution counters.
Tapping Update and a confirmation window is displayed.
8
Tap OK.9
The revolution counter for the selected axes is updated.
CAUTION
If a revolution counter is incorrectly updated, it will cause incorrect manipulator posi-
tioning, which in turn may cause damage or injury!
Check the synchronization position very carefully after each update. See Checking
the synchronization position on page 608.
10
Product manual - IRB 6710 593
3HAC085695-001 Revision: A
© Copyright 2023 ABB. All rights reserved.
6 Calibration
6.3.1 Updating revolution counters on OmniCore robots
Continued

Table of Contents

Related product manuals