EasyManua.ls Logo

ABB REG316 4 Series - Page 172

ABB REG316 4 Series
980 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ABB Switzerland Ltd REG 316*4 1MRB520049-Uen / Rev. F
3-134
Typical settings:
V-Setting 0.05 U
N
Delay 0.5 s
Note:
If a generator circuit-breaker is installed between the generator
and the step-up transformer, a second E/F protection scheme is
required for the zone between the step-up transformer and the
unit transformer. The second scheme is connected to the broken
delta secondary windings of three v.t’s. This scheme must also
remain stable for E/F’s on the HV system and during ferroreso-
nance phenomena and for this reason there is a resistor across
the broken delta as well. Frequently, the E/F protection is only
required to protect the cables and bar conductors, because the
transformers are protected by differential schemes and Buchholz
relays. In this case, the E/F protection setting is determined by
the voltage offset for an E/F at the lowest load voltage. A typical
setting for reliable E/F detection in an ungrounded system is
60 % U
N
, i.e.
V-Setting = 0.6 U
N
The delay can remain the same at 0.5 s. The second E/F
scheme usually gives only an alarm. Since the plant remains in
operation for an E/F on the cables, the resistor across the bro-
ken delta must be continuously rated.

Table of Contents

Related product manuals