GUID-02789F3F-DD47-4CDB-86DE-F9258E01BF50-ANSI V1 EN
Figure 30: Setup complete
To cancel the insertion, click Cancel.
If an error is found on the Setup Complete Page, it is not possible
to go back and make modifications. If an error is detected, cancel the
insertion by clicking Cancel and insert the IED again.
10. From the Plant structure view, check that PCM600 has turned online the IED that
was inserted to the bay level.