1. Verify the settings AutoEnerg or ManEnerg to be DBLL.
2. Apply a single-phase voltage of 30% GblBaseSelBus to the V-Bus and a single-
phase voltage of 100% GblBaseSelLine to the V-Line.
3. Check that the AUTOENOK and MANENOK outputs are activated after set
tAutoEnerg respectively tManEnerg.
4. Decrease the V-Line to 60% GblBaseSelLine and keep the V-Bus equal to 30%
GblBaseSelBus. The outputs should not be activated.
5. The test can be repeated with different values on the V-Bus and the V-Line.
Testing both directions (DLLB or DBLL)
1. Verify the local HMI settings AutoEnerg or ManEnerg to be Both.
2. Apply a single-phase voltage of 30% GblBaseSelLine to the V-Line and a single-
phase voltage of 100% GblBaseSelBus to the V-Bus.
3. Check that the AUTOENOK and MANENOK outputs are activated after set
tAutoEnerg respectively tManEnerg.
4. Change the connection so that the V-Line is equal to100% GblBaseSelLine and the
V-Bus is equal to 30% GblBaseSelBus. The outputs should still be activated.
5. The test can be repeated with different values on the V-Bus and the V-Line.
Testing the dead bus dead line (DBDL)
The test should verify that the energizing check function trips for a low voltage on both the
V-Bus and the V-Line, that is, closing of the breaker in a non-energized system. Test is
valid only when this function is used.
1. Verify the local HMI setting AutoEnerg to be Disabled and ManEnerg to be DBLL.
2. Set the parameter ManEnergDBDL to Enabled.
3. Apply a single-phase voltage of 30% GblBaseSelBus to the V-Bus and a single-
phase voltage of 30% GblBaseSelLine to the V-Line.
4. Check that the MANENOK output is activated after set tManEnerg.
5. Increase the V-Bus to 80% GblBaseSelBus and keep the V-Line equal to 30%
GblBaseSelLine. The outputs should not be activated.
6. Repeat the test with ManEnerg set to DLLB with different values on the V-Bus and
the V-Line voltage.
11.10.1.4 Testing the voltage selection
Testing the voltage selection for single CB arrangements
This test should verify that the correct voltage is selected for the measurement in the
SESRSYN function used in a double-bus arrangement. Apply a single-phase voltage of
1MRK 504 165-UUS - Section 11
Testing functionality by secondary injection
Transformer protection RET670 2.2 ANSI 243
Commissioning manual

Table of Contents

Other manuals for ABB RET670

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB RET670 and is the answer not in the manual?

ABB RET670 Specifications

General IconGeneral
Rated Frequency50/60 Hz
InputsAnalog and binary inputs
ApplicationProtection of power systems
Communication ProtocolsIEC 61850, DNP3, Modbus
Operating Temperature Range-25°C to +55°C
MountingRack mounted
Number of Binary InputsUp to 48
Number of Binary Outputs32
Protection FunctionsOvercurrent Protection
OutputsBinary outputs
EnclosureIP 54
TypeLine Differential Protection
Number of Analog Inputs24

Related product manuals