IEC140000144 V1 EN
Figure 16: Captured synchrophasor data
9.5.2 Verifying the IEEE C37.118/1344 UDP communication
After setting both PMU configuration and the UDP client configuration (As explained in
sections
Setting the PMU station communication (PMU Report), Setting the PMU station
communication (PMU configuration) and Setting the TCP/UDP client communication)
and making sure that the Ethernet communication is set up, click Connect on the PMU
Connection Tester tool.
1MRK 504 165-UUS - Section 9
Establishing connection and verifying the IEEE C37.118/1344 communication
Transformer protection RET670 2.2 ANSI 85
Commissioning manual

Table of Contents

Other manuals for ABB RET670

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB RET670 and is the answer not in the manual?

ABB RET670 Specifications

General IconGeneral
Rated Frequency50/60 Hz
InputsAnalog and binary inputs
ApplicationProtection of power systems
Communication ProtocolsIEC 61850, DNP3, Modbus
Operating Temperature Range-25°C to +55°C
MountingRack mounted
Number of Binary InputsUp to 48
Number of Binary Outputs32
Protection FunctionsOvercurrent Protection
OutputsBinary outputs
EnclosureIP 54
TypeLine Differential Protection
Number of Analog Inputs24