EasyManua.ls Logo

ABB ScreenMaster RVG200 - Page 15

ABB ScreenMaster RVG200
190 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ScreenMaster RVG200
Paperless recorder 3 Installation
OI/RVG200-EN 13
Referring to Fig. 3.4, secure the recorder in a panel as follows:
a Cut the correct sized hole in the panel see Fig. 3.3, page 12.
b Insert the recorder into the panel cut-out.
c Fit upper and lower panel clamps.
d Tighten the clamping screws evenly and securely to a torque of 20 Nm (177 lbf.in).
Caution. Correct tightening of the clamping screws is critical in order to ensure proper
compression of the panel seal and achieve the IP66 / NEMA 4X hose-down rating.
Fig. 3.4 Installing the recorder
2
3
1
3
4
4
AC power supply earth
(ground) stud

Table of Contents

Other manuals for ABB ScreenMaster RVG200

Related product manuals