EasyManua.ls Logo

Adaptec Storage Manager - Scheduling a Task

Adaptec Storage Manager
191 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 12: Managing Tasks 124
Scheduling a Task
If a task is lengthy and limits access to components on your storage
space, you may want to set a date and time for the task to complete,
instead of running the task while there is activity on your storage space.
If a task must be performed regularly, you can schedule it to recur at
preset times.
You can schedule these Adaptec Storage Manager tasks:
Expanding a logical drive
Changing a logical drives RAID level
Modifying the stripe size of a logical drive
Verifying a logical drive
Verifying and fixing a logical drive
To schedule one of these tasks:
1 Complete each step of the task until you are prompted to click
Apply. (Don’t click Apply.)
Schedule button

Table of Contents

Other manuals for Adaptec Storage Manager

Related product manuals