Total Access
®
3000/3010 System Manual
6TAATP602-1E
TOTAL ACCESS 3000/3010
ATP-602
Page 6 of 6
© 2002, ADTRAN, Inc.
1.3 Acceptance Test Checklist for ATP-602
1.3.1 Total Access 3000/3010 DS-3 Multiplexer Module Installation
Checklist
Test Step Completed (Initial)
1. Verify LED Operation
2. Verify BNC Connector Installation
3. Verify Coaxial Cable Installation
4. Pulse Shape Measurement
5. Power Level Test
6. Line Rate Accuracy Test
7. Output Jitter Level Test
8. Pulse Amplitude Test
Comments
Installation Engineer Sign-off
Name (print): Date Completed:
Signature:
Customer Sign-off
Name (print): Date Accepted:
Signature: