EasyManua.ls Logo

ADTRAN Total Access 3000 - 1.3 Completion Checklist

ADTRAN Total Access 3000
511 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Total Access
®
3000/3010 System Manual
6TADLP744-1E
TOTAL ACCESS 3000/3010
DLP-744
Page 10 of 12
© 2003, ADTRAN, Inc.
Perform Steps Below in the Order Listed
1.3 Completion Checklist
Obtain NSAP Area Address and System ID for OC-3 L2 MUX (Network
Administrator)
Obtain Target ID for Host SCU (Network Administrator)
Mount and power 1 Host Total Access 3000 and 2 Client Total Access 3000
shelves. Each shelf should have:
Host shelf
Chassis (1181001L1)
SCU (1181018L1)
1 or 2 OC-3 L2 MUX (1181031L2)
Quad BNC adapter (1181007L1)
Appropriate line cards for intended service
Client shelf
Chassis (1181001L1)
SCU (1181018L1)
1 or 2 STS-1 L2 MUX (1181030L2)
Dual BNC adapter (1181004L1)
Appropriate line cards for intended service
Connect High Speed (i.e. coax) cable from Host to Client shelves
Port 1 on Quad BNC connects to Dual BNC on Expansion Shelf #1, Tx to Rx,
Rx to Tx
Port 2 on Quad BNC connects to Dual BNC on Expansion Shelf #2, Tx to Rx,
Rx to Tx
Verify RS-485 connected
P2 “OUT” on Client shelf to P2 “IN” on Expansion Shelf 1. P2 “OUT” on
Expansion Shelf 1 to P2 “IN” on Expansion shelf 2. A to A, B to B,
Drain/Ground to Drain/Ground.
Provision SCU on Intelligent NE (Host) shelf
SCU/Provisioning/General/Management Ports/Interbank Comm. Mode – Host
SCU/Provisioning/TL1/Target ID – As appropriate designated by Network
Administrator
SCU/Provisioning/TL1/Legacy AID Compatibility – Enable

Table of Contents

Other manuals for ADTRAN Total Access 3000

Related product manuals