350 Flame Photometric Detector (FPD)
Replacement procedures
16 of 36
Jun 2001
Detectors
Agilent 6890 Gas Chromatograph Service Manual
Figure 350-8 Replacing the transfer line fused silica liner
9. Remove the transfer line nut and its ferrule, the heater/sensor cable
assembly, and the heated block.
Figure 350-9 Removing the transfer tube
Ignitor cable
Transfer line nut
Heater/sensor
cable assembly
Heater block
U-clamp screws
Liner
Transfer tube