IS-300A
3. Name and Functions of Each Section
3-5
Connector
Used to connect the circuit cable. Connect the other end of the cable to the
PROGRAM MONITOR I/O connector of IS-300A.
CAUTION
No settings or changes may be made to any item from the receipt of the start
signal through the end of the welding sequence and turning off the start
signal.
If setting is performed during the welding sequence, the following screen
appears. Press the TROUBLE RESET key .
Also, when changing a screen to call up another setting schedule during the
welding sequence, the TROUBLE RESET key does not work even if the
following screen appears. In this case, you need to turn on the power again.

Table of Contents