EasyManuals Logo

Applied Biosystems StepOne User Manual

Applied Biosystems StepOne
184 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #68 background imageLoading...
Page #68 background image
DRAFT
September 25, 2007 1:07 am, 4376782_Colocated_Installation.fm
Chapter 3 Install the Colocated Layout
Perform the RNase P Experiment
Applied Biosystems StepOne
and StepOnePlus
Real-Time PCR Systems
Installation, Networking, and Maintenance Guide
46
Notes
Unload the
Instrument
PHYSICAL INJURY HAZARD. During instrument operation, the
temperature of the sample block(s) can exceed 100 ° C. If the instrument has been used
recently, keep your hands away until the sample block(s) reach room temperature.
IMPORTANT! Wear powder-free gloves when you handle the
RNase P plate
.
1. Open the instrument drawer.
2. Remove the RNase P plate from the sample block(s).
3. Close the instrument drawer carefully.
4. Dispose of the RNase P plate.
IMPORTANT! Do not power off the instrument following a run. The instrument
automatically enters a hibernation mode when not in use. Power off the instrument
only when it will not be used for an extended period.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Applied Biosystems StepOne and is the answer not in the manual?

Applied Biosystems StepOne Specifications

General IconGeneral
BrandApplied Biosystems
ModelStepOne
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals